Bridge of Memories

Download Submission Pack

jake@designhousestudio.co.uk Single Bench Submission

rectory-lane-bridge-of-memories
Bench Numbers:
10
Estimated Hours Taken:
N/A
Materials:
Flint, Concrete, Wood
Depth:
500
Height:
450
Width:
1650
Ground Preparation:
Levelling of ground, digging two app. 150mm deep excavations for insertion of concrete bases.
Fixings / installation:
Bases will be inserted into excavations.
Maintenance:
Possible refilling of flint pebbles, maintaining the wooden seat.
Cost:
Estimated around £300